ADU Builder Placer County — Design-Build from Sketch to Keys

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Suspendisse varius enim in eros elementum tristique. Duis cursus, mi quis viverra ornare, eros dolor interdum nulla, ut commodo diam libero vitae erat.

Default Button Text
Sep 23, 2025
ADU Builder Placer County

Why people in Placer County are building ADUs

You want space for parents, a rental that helps with the mortgage, or a real home office that isn’t your car. ADUs (Accessory Dwelling Units) are the “small home, big win” option—faster and cheaper than a custom house, and California actually made the rules friendlier for you (we know… shocking).

The rules

  • Setbacks: detached ADUs are usually allowed about 4 ft from side/rear lines (we confirm on-site).

  • Size: many lots can support up to ~1,200 sq ft (lot coverage still matters).

  • Parking: often not required for conversions or near transit.

  • Solar: new detached ADUs generally need solar PV under current energy rules.

  • 60-day review: cities/counties must act on a complete ADU application in about 60 days (we make sure it’s complete).



School impact fees (read this!)

  • ≤ 750 sq ftNo school fees. We still get an exemption letter from your district.

  • > 750 sq ft → Fees may apply; you pay the school district (not the city), and bring back a Certificate of Compliance.

  • No certificate = no permit. Also, your 60-day clock doesn’t start until fees/exemption are on file.



Design-Build: one team from first sketch to last nail

You could hire a separate designer and contractor and referee their emails… or hire one design-build team (hi 👋). That means one plan, one budget, one schedule — fewer “but the plans said…” moments.


Our step-by-step process

  1. Feasibility & Site Walk — Setbacks, utilities, slope, trees, truck access, any HOA notes.

  2. Concept & Budget — Floor plans that live well and pass plan check.

  3. Engineering & Title 24 — Structure + energy model (this is where solar is sized).

  4. Permitting — We submit, track, and fix any corrections fast to keep that 60-day timeline working.

  5. Construction — Foundation → framing → MEP → finishes. Clean site, respectful crew, happy neighbors.

  6. Finals & Keys — Inspector sign-off, labeled shutoffs, tidy punch list. Your porch coffee is officially permitted.



Budget & timing (honest ranges)

  • Garage conversion: ~$110k–$170k

  • Detached studio/1-bed: ~$180k–$350k+

  • Larger 2-bed: $350k+ depending on site and finishes

  • Timeline: 9–12 months (design/permits 2–5 mo, build 4–6 mo, finals 1–3 wks)



FAQs — Placer County

Do HOAs matter?
State law limits how much HOAs can block ADUs, but a clean, friendly submittal helps. We prep it.

Can I rent it short-term?
Depends on local rules. Long-term rental is widely allowed; we’ll point you to current guidance.

Can I skip solar?
For new detached ADUs, usually no. Additions/conversions can be different—we’ll check your case.


Let’s start with a quick lot check

Send your address + 2–3 yard photos. We’ll give you a free feasibility look.

Questions now? Contact us